The Desert Becomes The New Frontier In Egypt

Loading

Building large-scale projects in the desert is a complex endeavour facing many logistical challenges that demand innovative solutions: the MB Crusher attachments.

When Egypt’s government unveiled its Vision 2030 at the centre of this comprehensive plan towards prosperity and sustainable growth it was the marvel of the New Administrative Capital. Being built in the desert outskirts of Cairo this bold and innovative colossal project makes the desert the new frontier in Egypt. Its construction began in 2015 and this compelling development covers 700 square kilometres of desert 45 kilometres east of Cairo. It will have so many captivating features and mega-projects like the Army octagon, stunning residential, business and administrative districts, a sprawling urban park reminiscent of the Nile, the tallest skyscraper in Africa, an airport, a super mall and much more.

A COST-EFFICIENT VISION MB CRUSHER ATTACHMENTS: A GAME-CHANGING STRATEGY

In the heart of Egypt’s monumental construction project for its new capital city lies a story of in- novation and resourcefulness. Amidst rising prices and escalating transportation costs, the project’s client chose an unconventional yet ground- breaking approach: leveraging MB Crusher attachments to repurpose existing rocks and waste from a nearby project into high-quality aggregate, saving a staggering sum and avoiding logistical difficulties. But it is not the first time that MB Crusher attachments have played a key role in building amenities in the unforgiving Egyptian desert. The integration of MB Crusher attachments in a large- scale project showcases the potential of innovative technology to revolutionize traditional practices. The cost-efficiency achieved through these attachments translates into economic savings, contributing to the overall viability of any project.

A VISIONARY PROJECT UNFOLDS

Egypt is building the New Capital to create many opportunities for housing and employment, the goal is also to eliminate the crowdedness that is one of the biggest problems now in Cairo. This ambitious project, poised to redefine urban landscapes as building a brand new metropolis in the heart of the desert will also mean the need for new transportation and also water. The integration of MB Crusher attachments highlights Egypt’s determination to overcome challenges while maximizing resources, reducing costs, and fostering sustainability in large-scale projects. Choosing the MB Crusher excavators attachment showcases how a pioneering frontier society has revolutionized traditional construction practice transforming a daunting task into a large- scale project to be executed with unprecedented efficiency and sustainability.

SAVINGS UNVEILED

As the construction of Egypt’s New Administrative Capital city gathered momentum our client equipped his Dossan DX340 with an MB Crusher BF120.4 jaw crusher bucket and embarked on a transformative endeavour saving 67,000 Egyptian pounds. The decision to recycle materials with the BF120.4 yielded astounding results. All that is needed to run the MB Crusher bucket is one excavator and one operator, and by producing their aggregate rather than purchasing it from suppliers, the client slashed costs saving 120 Egyptian pounds on every m3. Producing 280m3 per 8-hour shift and operating with two shifts per day this amounted to a remarkable 560 m3 of aggregate produced.

STREAMLINE OPERATION AND COST-EFFICIENCY

Water will be needed. This is why the New Delta Project is a huge achievement for Egypt as it will be the largest water treatment plant in the world, with a capacity of 7.5 million m3/day of water. In the realm of modern development, this project of unprecedented scale has an extensive 1.6 cubic meter road network. The realization of such a colossal undertaking hinged on more than mere ambition; it demanded adherence to strict schedules, and the formidable challenge of meeting project timelines without compromising quality or incurring exorbitant costs was assigned to the MB Crusher BF135.8 bucket. The BF135.8, with its remarkable load capacity of 1.6 cubic meters, proved to be the perfect tool for the job, surpassing the capabilities of larger fixed crushers and significantly boosting productivity and slashing cost by nearly 40%. Streamlining of operations, by using the BF135.8 mounted on the Doosan 480LC is the reason behind the savings in this large project, MB Crusher attachment allowed the reduction in labour requirements, from over a dozen individuals and several machines to just one excavator and operator, and eliminated the need for transporting materials to a fixed site, further optimizing time and resources. Plus the utilization of natural resources already at the site minimized waste.